Create a business continuity plan

task australia Updated Nov 6, 2026 8 min read create-bcp-plan-in-uib-ws.md
Raw file servicenow.com

Create a business continuity plan in ServiceNow Business Continuity Management.

Before you begin

Role required: sn_bcm.program_manager or sn_bcm.planner. For plan owner group filter: sn_bcp.plan_contributor or sn_bcp.plan_manager

Warning: The BCP Plan Manager (sn_bcp.plan_manager) now includes the Doc writer (sn_doc.writer) role that provides read and write permissions to the document templates.

About this task

You can assign ownership of a business continuity plan to an individual owner, to an owner group, or to both. When you create a plan, you're added as the Plan owner by default.

Warning: You must provide either a Plan owner or Plan owner group to save the record.

When you select an owner group, the Plan owner field is limited to members of that group. To assign the plan to a group only, clear the Plan owner field. All members of the owner group have the same edit rights on the plan as the owner.

Procedure

  1. Navigate to Workspaces > Business Continuity Workspace > Planning in the list view and select New.

    The Create Plan form is displayed.

  2. Fill in the required fields in the Details tab of the Create Plan form.

    Field Description
    Name Name of the business continuity plan
    Template BCP template to use as a basis for the plan
    Type Classification of the plan (for example, IT, Departmental, Enterprise)
    Business Unit Business unit responsible for the plan
    Department Department responsible for the plan
    Expires Expiration date for the plan review
  3. Assign plan ownership by selecting the appropriate ownership model in the User Administration or Assignment details section.

    1. Select the Plan owner group field, select a group from the list (filtered to show only groups with the Plan Owner or equivalent BCM Manager role), and leave the Plan owner field empty.

      Group ownership only: The plan is owned by the group as a whole, with any member able to take action on the record.

    2. Select the Plan owner field, select a user, and save the record.

      The legacy ownership model remains fully supported.

      Group and individual ownership: Select the Plan owner group field and choose a group. Then select the Plan owner field and select a user from the filtered list (showing only members of the selected group). The record is owned by the group with a specific individual designated as the point of contact.

    3. Select the individual first in the Plan owner field, then select the group in the Plan owner group field, and save.

      Use this option if you want to assign an individual owner who is not a member of the selected group. This accommodates cases where an individual outside the group is responsible for the record.

    Note: If the individual owner leaves the group, the group ownership remains intact, and another member can assume the role of individual owner by updating the Plan owner field.

  4. Add an asset to the scope of the plan in the Scope tab and view the primary elements defined in the plan template.

    Enter details based on the primary asset in the plan record. It includes Recovery Time Objective (RTO), Recovery Point Objective (RPO), Recovery Tier, and BIA link. Updating the dependencies refreshes the asset details with information from the latest unarchived BIA record.

    You can mark an asset as a primary scope or assign it as a related asset. You can link a related asset to a primary scope within the plan. This simplifies the classification of asset types and enables you to view the relationships directly on the plan record page. You can see which assets are impacted when the primary scope is operationally down.

    The Asset dependencies tab displays detailed information about the assets. It replaces the Primary scope and Related asset toggles previously found in the Scope tab. The Type column has been renamed to Types to allow an asset to be categorized as both a primary scope and a related asset. The BIA column has been updated from a document ID type to a reference type. You can now select and access the BIA record and dot-walk to the plan record.

  5. Update the dependencies by selecting the Update dependencies button.

    The system pulls both related assets and their relationships. A message indicates that the dependencies are being updated, and you must refresh the page to view the updated dependencies. You can view dependency updates in the snapshot record.

    When you add a dependency in the Scope tab, the system retrieves the most recent Business Impact Analysis (BIA). The system uses the BIA's "Finalized RTO" and "Finalized RPO" values for that specific dependency. Values for "Recovery Tier" and "BIA" are also retrieved and displayed in the plan record.

    If you update the BIA's RTO and RPO values after fetching a dependency, select Update dependencies to fetch the latest values.

  6. Review the Finalized RTO and Finalized RPO values columns in the Scope tab.

    The Finalized RTO and Finalized RPO fields are populated from the most recent Business Impact Analysis record when you add a dependency.

  7. Add contributors to the business continuity plan by launching the Contributors panel from the side-bar.

    BCP contributors with the sn_bcp.plan_contributor role have read, write, and delete access to the business continuity plan. If you have the BCP manager, BCM lead, or plan contributor role, you can add or remove contributors. BCP contributors can edit the list of contributors and edit the BCP.

  8. In the Documentation tab, record the recovery capabilities of the plan in the documentation sections.

    This tab contains details of the plan in the Sections panel and the Create new section tab. It includes informational fields such as Title, Description, Order, and Contents.

  9. Define recovery teams, loss scenarios, and recovery tasks for the plan in the respective tabs:

    • Recovery teams – Assign recovery teams with their Name, Description, Groups, and Users.

      Note: Prior to BCM core 12.x.x, local recovery teams could be added to the plans. Starting with BCM core 12.x.x, you can add global recovery teams to the plans.

    • Loss scenarios – Define applicable loss scenarios with Name and Description

    • Recovery tasks – Create recovery tasks with Planned order, Short description, Owner, Dependencies, Planned duration, Phase, and Asset recovery level. Recovery tasks are organized based on their dependencies; the system determines the sequence based on assigned dependencies, allowing independent tasks to be handled simultaneously. Important: A cyclic dependency occurs when two or more recovery tasks rely on each other, either directly or indirectly. To prevent cyclic dependencies, verify that the same plan is not triggered multiple times. If plans are activated beyond 10 levels or hierarchical links involve more than 10 levels of plans, an error message is displayed.

  10. Complete the remaining required fields on the Plan record form and select Save.

    The plan is saved in the Draft state and displayed in the List view of the Planning records.

  11. Review and confirm the group ownership fields in the PDF and Microsoft Word reports.

    You can generate reports by selecting More actions > Generate PDF or More actions > Generate MS Word.

    Starting with BCM Core version 12.x.x, issues and group ownership details related to plans appear in separate sections in the PDF and Microsoft Word reports.

  12. View your Plan group's pending tasks and Plan owner's assigned items in the My tasks page.

Result

The business continuity plan is created in the Draft state with assigned ownership (individual, group, or both). The state and details of the business continuity plan are accessible through the following tabs:

Tab Description
Overview Current state and overall state progression of the BCP
Details Plan details including Name, Template, Type, Plan owner, Plan owner group, BCM lead, Business unit, Department, Expires, Description, comments, and Activity panel
Scope Asset types list with Item, Types, Recovery time objective, Recovery point objective, Recovery tier, BIA, Status in source, and Synchronized on columns for detailed information. Asset dependencies tab displays hierarchical relationships between parent and child assets.
Documentation Recovery capabilities of the plan recorded in documentation sections
Associated plans Associated plan types including Upstream plans, Downstream plans, and Related plans
Recovery teams Recovery teams assigned for the business continuity plan
Loss scenarios Loss scenarios applicable to the business continuity plan
Recovery tasks Details of recovery tasks including Planned order, Short description, Owner, Dependencies, Planned duration, Phase, and Asset recovery level

What to do next

After creating the business continuity plan, you can perform additional actions by selecting More actions:

  • Discuss – Add a subject and participants to discuss the plan

  • Generate MS Word – Generate a downloadable Word document report

  • Generate PDF – Generate a downloadable PDF report (with Smart assessment details and dependencies)

  • Copy – Create a copy of the BCP with all details, assessments, and questions.

    The copied plan inherits both the original Plan owner and Plan owner group.

  • 360º view – Generate 360° relationships for a graphical presentation of the BCP and its relationships

  • Delete – Delete the BCP record (related records may also be deleted)

To revert an archived business continuity plan to the Draft state, select the Edit button on the form. (Available in release 9.0.x and later)

  • Create Plan form
    Use the Create Plan form in BCM UIB Workspace to add the details about the business continuity plan (BCP).

Parent Topic:Structured workflows for BCPs

Related topics

Group ownership in BIA, plan, and event records

Add or create an issue from a plan

Search documentation
Search document titles and file paths on the australia branch