Complete the Prepare task for an RMA order line

task australia Updated Sep 10, 2026 2 min read complete-rma-assessment.md
Raw file servicenow.com

Complete the Prepare task for an RMA order line so that you can proceed with replacing or repairing the given enterprise asset. Alternatively, you can reject the RMA to avoid taking any action on the given enterprise asset.

Before you begin

Role required: sn_eam.enterprise_asset_manager

Procedure

  1. From the Enterprise Asset Workspace, navigate to the Inventory view.

  2. Select the RMA orders tab.

  3. From the list of available RMA orders, select the RMA order that you want to close.

    The RMA order record opens.

  4. On the RMA Order Lines tab of the RMA order record, select the RMA order line of the enterprise asset that you want to replace, repair, or take no action on.

    The RMA order line record opens.

  5. On the RMA Line Tasks tab of the RMA order line record, select the task number for the Prepare task.

    Alternatively, select the task number that is displayed in the Current task field of the RMA order line record header.[Omitted image "rma-order-line-details-header.png"] Alt text: Current task field.

    The Prepare task opens.

  6. On the Details tab of the Prepare task, fill in the fields.

Field

Description

RMA Line Task Details

Stockroom

Stockroom that the defective enterprise asset is located in. This field populates automatically.

Vendor

Vendor of the defective enterprise asset. This field populates automatically.

Vendor RMA number

RMA reference number provided by the asset vendor.

State

State of the task.

Assignment group

Group to which the task is assigned.

Assigned to

User to which the task is assigned.

Work notes list

Users who receive notifications when work notes are added to the task.

RMA type

Option that indicates how you want to proceed with the RMA process for the defective enterprise asset. Select one of the following options:- On-site: Option to complete the RMA process on-site. With this option, you can repair the defective enterprise asset on-site.

  • Off-site: Option to complete the RMA process off-site with the asset vendor. With this option, the defective enterprise asset can be replaced or repaired off-site by the asset vendor.
  • Reject: Option to reject the RMA for the defective enterprise asset. With this option, you can avoid taking any action on the defective enterprise asset.

Short description

Brief description of the task.

Description

Detailed description of the task.

Notes

Work notes

Notes about the task that are visible to all users within your organization.

7. Select **Close Task**.

Result

The Prepare task automatically closes with an updated state of Closed Complete.

What to do next

If you set the RMA type field to On-site or Off-site, complete all subsequent replacement or repair tasks to move the RMA order line to the Completed stage. If you set the RMA type field to Reject, the RMA order line automatically moves to the Completed stage, and no further action is required.

Parent Topic:Closing a Return Merchandise Authorization (RMA) order for your defective enterprise assets

Search documentation
Search document titles and file paths on the australia branch