Associate a hardware model with a Calculated lifecycle template
Associate a hardware model with a Calculated lifecycle template to populate the lifecycle details of the model automatically.
Before you begin
Role required: asset
Procedure
-
Navigate to Workspaces > Hardware Asset Workspace > Model management.
-
Select the All models tab.
-
Select the model that you want to associate with a Calculated lifecycle template.
-
In the Model Details section of the Model form, enter the template details.
-
In the Calculated lifecycle template field, select the calculated lifecycle template that you want to apply to the model.
-
In the Calculated lifecyle start date, select the date from which the Phase start date and Phase end date are calculated for each lifecycle phase defined in the Calculated lifecycle template that you selected.
-
-
Select Save.
Result
The list of lifecycle phases with details such as Phase start date, Phase end date, and Source is displayed in the Model Lifecycles tab.
Parent Topic:Manage the lifecycle of hardware models with calculated lifecycle templates
---
title: Associate a hardware model with a Calculated lifecycle template
description: Associate a hardware model with a Calculated lifecycle template to populate the lifecycle details of the model automatically.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/australia/it-asset-management/hardware-asset-management/associate-hardware-model-cal-temp.html
release: australia
product: Hardware Asset Management
classification: hardware-asset-management
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Calculated lifecycle templates, Repair and maintenance, Use, Hardware Asset Management, IT Asset Management, Asset Management]
---
# Associate a hardware model with a Calculated lifecycle template
Associate a hardware model with a Calculated lifecycle template to populate the lifecycle details of the model automatically.
## Before you begin
Role required: asset
## Procedure
1. Navigate to **Workspaces** > **Hardware Asset Workspace** > **Model management**.
2. Select the **All models** tab.
3. Select the model that you want to associate with a Calculated lifecycle template.
4. In the Model Details section of the Model form, enter the template details.
1. In the **Calculated lifecycle template** field, select the calculated lifecycle template that you want to apply to the model.
2. In the **Calculated lifecyle start date**, select the date from which the Phase start date and Phase end date are calculated for each lifecycle phase defined in the Calculated lifecycle template that you selected.
5. Select **Save**.
## Result
The list of lifecycle phases with details such as Phase start date, Phase end date, and Source is displayed in the Model Lifecycles tab.
**Parent Topic:**[Manage the lifecycle of hardware models with calculated lifecycle templates](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/it-asset-management/hardware-asset-management/manage-ham-lifecycle-temp.md)
| title | Associate a hardware model with a Calculated lifecycle template |
| description | Associate a hardware model with a Calculated lifecycle template to populate the lifecycle details of the model automatically. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/australia/it-asset-management/hardware-asset-management/associate-hardware-model-cal-temp.html |
| release | australia |
| product | Hardware Asset Management |
| classification | hardware-asset-management |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Calculated lifecycle templatesRepair and maintenanceUseHardware Asset ManagementIT Asset ManagementAsset Management |