Target form

reference australia Updated Sep 30, 2026 10 min read target-form-egm.md
Raw file servicenow.com

Use the Target form to track and measure the progress of the goals.

Note: For Operational Sustainability Workspace and Strategic Planning users, to view the other fields that aren't added to the default view or your custom form view on the form in the workspace, configure the default or custom form layout. For information on how to configure the form layout, see Configuring the form layout.

Field

Description

Name

Name of the target.

Number

Unique identifier of the target, for example TRGT0001001. The value is generated automatically and is read-only. To use a different prefix, such as KR, see Customize label for Goal and Target tables.

Goal

Name of the associated goal. This field is auto-populated when creating a target from the Targets related list on the Goal form.

Description

Brief description of the target.You can refine target description using the Refine records skill, if the ServiceNow Otto for SPM application is installed.

State

State of the target. The state can be Draft, In progress, Approved, Complete, Pending, Achieved, Not Achieved, or Cancelled.

Status

Status of the target. The status can be Red, Yellow, Green, or No status.

Progress

Percentage of the target execution that is complete. The value is calculated automatically.If the Type field is set to Maximize, the progress value is calculated using the following formula:

Text
Progress = (Actual value - Base value) / (Target value - Base value) x 100

If the Type field is set to Minimize, the progress value is calculated using the following formula.

Text
Progress = (Base value - Actual value) / (Base value - Target value) x 100

For Maintain-type targets (Maintain above, Maintain below, Maintain constant), progress is the percentage of breakdown periods that meet their planned target, counted up to the latest period with an actual value. See Automatic status calculation for targets for detailed examples.

For more information on how the progress value is calculated when the weight scale is defined, see Progress value calculation.

Impact on goal

A numerical value that represents the importance of the target relative to the other targets of the goal. If there are any subgoals present, they are also considered for relative weights and consequent progress calculation. By default, the value is (1) Neutral.The available options are:

  • (0) No impact
  • (1) Neutral
  • (2) Moderate
  • (3) High
  • (4) Very high
  • (5) Maximum

Note: This field is available only when the sn_gf.weighted_average_enabled system property is set to Yes.

Assigned entity type

Entity type to which the target is assigned. For example, Business Unit, Department, Company, or Portfolio.

Assigned entity

Entity to which the target is assigned.

Owner

Owner of the target. By default, the name of the user creating the target is populated.

Contributors

Users who contributes to the achievement of the target. By default, the contributors of the associated goal are populated.

|Field|Description| |-----|-----------| |Start date|Start date for the target. By default, the start date of the associated goal is populated.| |End date|End date for the target. By default, the end date of the associated goal is populated.|

Field

Description

Unit of measure

Measure type for the specified value. Usage of the measure such as cost, time, and rate. The available measure types are stored in the Units [sn_gf_units] table. Unit of measure defines the type of the target as qualitative or quantitative. The available unit of measures for the quantitative target are #, $, %, and Days. The available unit of measure for the qualitative target is Yes/No.

Type

Target type that signifies the direction of achievement or maintenance strategy.- Maximize: The direction of the progress is toward the target value from the base value where the base value must be less than the target value. Use this type for goals that measure growth or increase (for example, revenue, customer satisfaction, productivity).

  • Minimize: The direction of the progress is toward the target value from the base value where the target value must be less than the base value. Use this type for goals that measure reduction or decrease (for example, costs, defects, environmental impact).
  • Maintain above: The metric must stay at or above the planned target for success. Use this type for goals that require a minimum level to be maintained (for example, service uptime above 98%, compliance rating above 95%). Progress is the percentage of breakdown periods where the actual value is greater than or equal to the planned target.
  • Maintain below: The metric must stay at or below the planned target for success. Use this type for goals that require a maximum level not to be exceeded (for example, operating costs below $5M annually). Progress is the percentage of breakdown periods where the actual value is less than or equal to the planned target.
  • Maintain constant: The metric must stay within a tolerance band around the planned target. The band is ±5% by default and is set by the sn_gf.maintain_constant_tolerance_percent system property. Use this type for goals that require stability or consistency (for example, employee headcount at 250 staff, quality score at 85%). Progress is the percentage of breakdown periods where the actual value falls within the tolerance band.
  • Milestone: Fixed type. Only the qualitative target values are allowed (that are set in the Unit of measure field for the target) to capture the achievement of the target. The Milestone option is applicable only for qualitative targets.

The Type field becomes read-only with the value populated as Milestone for qualitative targets (when the Unit of measure field is set to a qualitative target value).

For more information on how progress is calculated for each target type, see Automatic status calculation for targets.

You can change the type of a saved target even when actuals exist. The value in the Unit of measure field doesn't change when you change the type. For details, see Change the type of a target.

Start value

Start value of the target. The start value can also be considered as the present or current value.This field becomes read-only when a value is entered in the Actual value field. Clear the Actual value field to update a value in the Base value field.

This field is available when the Type field is set to Maximize or Minimize.

Final target value

Final target value of the target. The target value should be aspirational and should challenge the teams.This field is available when the Type field is set to Maximize, Minimize, or Maintain types.

Baseline reference

Past achievement of the target to provide reference for future performance. This value is only for reference purpose and not considered for target progress calculation.

Actuals to date

Actual value of the target at a given time.For Maintain types, this value is the actual value entered for the latest target breakdown period, not a sum of all periods.

This field is available when the Type field is set to Maximize, Minimize, or Maintain types.

Check-in frequency

Option to specify breakdown intervals for the target and how frequently the owner or contributor should update the actual value of the target. Breaking down the target into smaller periods helps you set a target for smaller periods and focus on the specific breakdown targets. The available options are Daily, Weekly, Monthly, Quarterly, Period (fiscal mode only), and Yearly. Target breakdowns are automatically created when you set this field to any of the available options other than None. For Maintain type targets, breakdowns allow you to measure target achievement across each time period. For more details on target breakdowns, see Target breakdowns in Strategic Planning.Note: The target breakdowns feature isn't supported for qualitative targets.

Target value distribution

Option to specify the target to be calculated cumulatively or non-cumulatively. The available options are Split equally across the time period (non-cumulative) and Spread linearly across the time period (cumulative).This field is available only when the Check-in frequency field is set to any of the available options other than None.

This field isn't available when the Type field is set to Maintain above, Maintain below, or Maintain constant, because each breakdown's planned target equals the final target value.

Remark

Remark entered by the user for business justification when updating the actuals.

Check-in due date

Due date that the owner or contributor of the target must update the actual value of the target to.

Confidential

Option to restrict the access for this target record to the specific users populated in the Allowed groups and Allowed users fields.This field is available when the Operational Sustainability Management application is installed and the sn_grc.enable_record_confidentiality property is enabled. This field is applicable only when the Classification field in the goal form of the target is populated as Environmental, Social, or Governance. The required role to configure this field is sn_esg.reader.

Note: Irrespective of the target record set to confidential or not, the target progress value rolls up to its goal for calculating the progress value of the goal.

Allowed groups

User groups who can access the target record. This field is applicable only for the Operational Sustainability Workspace users.Even though a user group is populated in this field, the users can access the confidential record only if the user group has the sn_esg.reader role.

This field is available when the Confidential field is set to true.

Allowed users

Users who can access the target record. This field is applicable only for the Operational Sustainability Workspace users.Even though a user name is populated in this field, the user can access the confidential record only if the user has the sn_esg.reader role.

This field is available when the Confidential field is set to true.

|Field|Description| |-----|-----------| |Comments|Detailed comments for the target to facilitate collaboration.|

Field

Description

Automate actual value

Option to enable the target automation feature for the target.

Actual value source

Target source table that the data is fetched from to auto-update the actual value of the target on the target's review due date.This field is available when the Automate actual value field is set to true.

## Variables section of the Target form

This section appears based on the context variables available in the target source that is selected in the Actual value source field.

When you select Actual value source as Benefit Plans (predefined target automation script for benefit plans), the Benefit Plan field appears in this section, from which you can select the required benefit plans for automating the actual value of the target.

Note: You can use the Benefit Plans custom script only when PPM Standard (Project Portfolio Management) is installed. If you can't find the benefit plan that you want to select, you can find and select the same from Heisenberg UI by navigate to Enterprise Goal Management > Targets and opening the Target form.

Parent Topic:Form field information for Strategic Planning

Search documentation
Search document titles and file paths on the australia branch