Detach a schedule from an equipment model entity
task australia Updated Sep 10, 2026 1 min read detach-equipment-model-entity-schedule.md
Detach an existing schedule from an equipment model entity with the Industrial Process Manager application. If a schedule no longer applies to an equipment model entity, you can easily remove it so that it doesn't show up for that entity.
Before you begin
Role required: sn_isa_schedule_admin
Procedure
-
Navigate to All > Equipment Model - ISA > Equipment Model Entities.
-
Select an equipment model entity record.
-
Select the Schedules tab.
-
Select Edit.
-
In the Schedules List, select the schedule that you want to detach from the equipment model entity.
-
Move the selected schedule to the Collection list by using the middle arrows.
-
Select Save.
Parent Topic:Associate a schedule with an equipment model entity
42 lines · 1.8 KB
--- title: Detach a schedule from an equipment model entity description: Detach an existing schedule from an equipment model entity with the Industrial Process Manager application. If a schedule no longer applies to an equipment model entity, you can easily remove it so that it doesn't show up for that entity. locale: en-US canonical_url: https://www.servicenow.com/docs/r/australia/operational-technology/industrial-process-manager/detach-equipment-model-entity-schedule.html release: australia product: Industrial Process Manager classification: industrial-process-manager topic_type: task last_updated: "2026-09-10" reading_time_minutes: 1 breadcrumb: [Associate a schedule with an equipment model entity, Managing an equipment model entity schedule, Configure the Industrial Process Manager, Industrial Process Manager, Operational Technology] --- # Detach a schedule from an equipment model entity Detach an existing schedule from an equipment model entity with the Industrial Process Manager application. If a schedule no longer applies to an equipment model entity, you can easily remove it so that it doesn't show up for that entity. ## Before you begin Role required: sn\_isa\_schedule\_admin ## Procedure 1. Navigate to **All** > **Equipment Model - ISA** > **Equipment Model Entities**. 2. Select an equipment model entity record. 3. Select the **Schedules** tab. 4. Select **Edit**. 5. In the Schedules List, select the schedule that you want to detach from the equipment model entity. 6. Move the selected schedule to the Collection list by using the middle arrows. 7. Select **Save**. **Parent Topic:**[Associate a schedule with an equipment model entity](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/australia/markdown/australia/operational-technology/industrial-process-manager/associate-schedules-with-equipment-model-entity.md)
| title | Detach a schedule from an equipment model entity |
| description | Detach an existing schedule from an equipment model entity with the Industrial Process Manager application. If a schedule no longer applies to an equipment model entity, you can easily remove it so that it doesn't show up for that entity. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/australia/operational-technology/industrial-process-manager/detach-equipment-model-entity-schedule.html |
| release | australia |
| product | Industrial Process Manager |
| classification | industrial-process-manager |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Associate a schedule with an equipment model entityManaging an equipment model entity scheduleConfigure the Industrial Process ManagerIndustrial Process ManagerOperational Technology |