Modify Qualys PC Results start date
task australia Updated Sep 10, 2026 1 min read modify-test-results-startdate.md
If data is missing for the start date in the Qualys PC Results import, it can be modified.
Before you begin
Role required: sn_vul_qualys.admin
Procedure
-
Navigate to All > Qualys Vulnerability Integration > Administration > Primary Integrations.
-
Click Qualys PC Results integration.
-
Click Integration Details.
-
Set the Start time field to a value in the past, so all scanned and detected test results, since that time, are detected.
Note: If the date is left empty, no data is returned on the first run. Set the value to a maximum of a month in the past. This setting keeps large amount of data from exceeding the Qualys API rate limitations, as well as triggering execution timeouts.
-
Click Submit or Update.
-
Click Execute Now to run immediately.
40 lines · 1.5 KB
---
title: Modify Qualys PC Results start date
description: If data is missing for the start date in the Qualys PC Results import, it can be modified.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/australia/security-management/configuration-compliance/modify-test-results-startdate.html
release: australia
product: Configuration Compliance
classification: configuration-compliance
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Resolving Configuration Compliance import issues, Reference, Configuration Compliance, Unified Security Exposure Management, Security Operations]
---
# Modify Qualys PC Results start date
If data is missing for the start date in the Qualys PC Results import, it can be modified.
## Before you begin
Role required: sn\_vul\_qualys.admin
## Procedure
1. Navigate to **All** > **Qualys Vulnerability Integration** > **Administration** > **Primary Integrations**.
2. Click **Qualys PC Results** integration.
3. Click **Integration Details**.
4. Set the **Start time** field to a value in the past, so all scanned and detected test results, since that time, are detected.
**Note:** If the date is left empty, no data is returned on the first run. Set the value to a maximum of a month in the past. This setting keeps large amount of data from exceeding the Qualys API rate limitations, as well as triggering execution timeouts.
5. Click **Submit** or **Update**.
6. Click **Execute Now** to run immediately.
| title | Modify Qualys PC Results start date |
| description | If data is missing for the start date in the Qualys PC Results import, it can be modified. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/australia/security-management/configuration-compliance/modify-test-results-startdate.html |
| release | australia |
| product | Configuration Compliance |
| classification | configuration-compliance |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Resolving Configuration Compliance import issuesReferenceConfiguration ComplianceUnified Security Exposure ManagementSecurity Operations |