Run scheduled job to back up staging table
You can take a backup of the data on the staging table at periodic intervals.
Before you begin
Role required: admin
About this task
Data present in the staging table backed up if:
- Import tasks are in an Active state.
- The data creation date is earlier than the current date.
Note: Import tasks that are in a Canceled or Closed state aren’t backed up.
Procedure
-
Navigate to All > System Definition > Scheduled Jobs.
-
Find the Scheduled Staging Data Backup Job scheduled job.
Note: The job is inactive by default. Select the Active check box to run the scheduled job at the scheduled time.
-
Select Execute Now.
To configure the backup period, specify a number in the Value field for the
sn_acct_lc.BackupDayssystem property. For example, if the Value field is set to 2, data that is more than two days old is included in the backup.
Result
A CSV file is created and attached to the import task. The file name includes the name of the staging file and the creation date in the format stagingTable-dateCreated.csv.
Parent Topic:Configure the account onboarding playbook
---
title: Run scheduled job to back up staging table
description: You can take a backup of the data on the staging table at periodic intervals.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/acct-lifecycle-events/account-lifecycle-backup.html
release: brazil
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Account onboarding playbook, Configure, Customer Success Management]
---
# Run scheduled job to back up staging table
You can take a backup of the data on the staging table at periodic intervals.
## Before you begin
Role required: admin
## About this task
Data present in the staging table backed up if:
- Import tasks are in an **Active** state.
- The data creation date is earlier than the current date.
**Note:** Import tasks that are in a **Canceled** or **Closed** state aren’t backed up.
## Procedure
1. Navigate to **All** > **System Definition** > **Scheduled Jobs**.
2. Find the **Scheduled Staging Data Backup Job** scheduled job.
**Note:** The job is inactive by default. Select the **Active** check box to run the scheduled job at the scheduled time.
3. Select **Execute Now**.
To configure the backup period, specify a number in the Value field for the `sn_acct_lc.BackupDays` system property. For example, if the Value field is set to 2, data that is more than two days old is included in the backup.
## Result
A CSV file is created and attached to the import task. The file name includes the name of the staging file and the creation date in the format `stagingTable-dateCreated.csv`.
**Parent Topic:**[Configure the account onboarding playbook](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/acct-lifecycle-events/account-lifecycle-configure.md)
| title | Run scheduled job to back up staging table |
| description | You can take a backup of the data on the staging table at periodic intervals. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/acct-lifecycle-events/account-lifecycle-backup.html |
| release | brazil |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Account onboarding playbookConfigureCustomer Success Management |