Duplicate a schedule in Arc
task brazil Updated Oct 26, 2026 1 min read duplicate-schedule.md
Copy an existing schedule as a starting point for a new one, so you don't enter the same details again.
Before you begin
You have at least one schedule. For more information, see Create and manage scheduled tasks in Arc.
Role required: sn_app_arc.user
About this task
The original schedule stays as it is. The copy is a separate schedule that you can change before you save it.
Procedure
-
In Arc, select Schedules in the sidebar.
Each schedule appears as a card that shows its name, instruction, how often it runs, and its next and last run.
-
On the schedule's card, select the duplicate icon.
-
Change the Name, Message, or the settings under What time? as needed.
-
Select Schedule it.
Result
The new schedule appears as its own card in the Schedules list.
Parent Topic:Create and manage scheduled tasks in Arc
Keywords duplicate schedulecopy schedulescheduled tasks
47 lines · 1.7 KB
---
title: Duplicate a schedule in Arc
description: Copy an existing schedule as a starting point for a new one, so you don't enter the same details again.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/application-development/duplicate-schedule.html
release: brazil
topic_type: task
last_updated: "2026-10-26"
reading_time_minutes: 1
keywords: [duplicate schedule, copy schedule, scheduled tasks]
breadcrumb: [Create and manage scheduled tasks in Arc, Use, ServiceNow Arc, Extend, AI Workflow Factory Prime, Agentic app development, Building applications]
---
# Duplicate a schedule in Arc
Copy an existing schedule as a starting point for a new one, so you don't enter the same details again.
## Before you begin
You have at least one schedule. For more information, see [Create and manage scheduled tasks in Arc](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/application-development/create-scheduled-tasks.md).
Role required: sn\_app\_arc.user
## About this task
The original schedule stays as it is. The copy is a separate schedule that you can change before you save it.
## Procedure
1. In Arc, select **Schedules** in the sidebar.
Each schedule appears as a card that shows its name, instruction, how often it runs, and its next and last run.
2. On the schedule's card, select the duplicate icon.
3. Change the **Name**, **Message**, or the settings under **What time?** as needed.
4. Select **Schedule it**.
## Result
The new schedule appears as its own card in the **Schedules** list.
**Parent Topic:**[Create and manage scheduled tasks in Arc](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/application-development/create-scheduled-tasks.md)
| title | Duplicate a schedule in Arc |
| description | Copy an existing schedule as a starting point for a new one, so you don't enter the same details again. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/application-development/duplicate-schedule.html |
| release | brazil |
| topic_type | task |
| last_updated | 2026-10-26 |
| reading_time_minutes | 1 |
| keywords | duplicate schedulecopy schedulescheduled tasks |
| breadcrumb | Create and manage scheduled tasks in ArcUseServiceNow ArcExtendAI Workflow Factory PrimeAgentic app developmentBuilding applications |