Assign multi-day tasks to agents
Assign a work order task that requires multiple schedules or days to complete the job to a field service agent. This capability avoids having to create more than one task for the same job.
Before you begin
If you are scheduling a task across multiple schedule entries or days, a work schedule must have been assigned to the agent. For more information, see Create a work schedule for agents.
Note: If the agent schedule has not been defined and you are auto-assigning a task, the system uses the default schedule.
Role required: wm_admin
About this task
For information about how to assign a multi-day task to a crew, see Assign work order tasks to crews.
This procedure explains how you can assign a multi-day task to an agent using ServiceNow AI Platform. For information about how to assign a multi-day task using Dispatcher Workspace, see Assign work order tasks to agents.
Procedure
-
Navigate to All > Field Service Management > Work Order > Work Order Tasks.
-
Select the desired task for assignment.
-
Select the Assign across the schedule entries check box if it is not already selected.
-
Assign the task.
|
Option |
Description |
|---|---|
|
To assign a task manually |
|
|
To auto-assign a task |
|
Result
The task schedule spanning multiple schedule entries, days, or weeks is assigned to an agent.
--- title: Assign multi-day tasks to agents description: Assign a work order task that requires multiple schedules or days to complete the job to a field service agent. This capability avoids having to create more than one task for the same job. locale: en-US canonical_url: https://www.servicenow.com/docs/r/field-service-management/field-service-scheduling/assign-multi-day-task.html release: brazil product: Field Service Scheduling classification: field-service-scheduling topic_type: task last_updated: "2026-09-10" reading_time_minutes: 1 breadcrumb: [Assigning multi-day tasks to agents, Scheduling and dispatching, Use, Field Service Management] --- # Assign multi-day tasks to agents Assign a work order task that requires multiple schedules or days to complete the job to a field service agent. This capability avoids having to create more than one task for the same job. ## Before you begin If you are scheduling a task across multiple schedule entries or days, a work schedule must have been assigned to the agent. For more information, see [Create a work schedule for agents](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/field-service-management/field-service-manager-workforce/create-agent-work-schedule.md). **Note:** If the agent schedule has not been defined and you are auto-assigning a task, the system uses the default schedule. Role required: wm\_admin ## About this task For information about how to assign a multi-day task to a crew, see [Assign work order tasks to crews](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/field-service-management/field-service-manager-workforce/assign-wot-crew-operations.md). This procedure explains how you can assign a multi-day task to an agent using ServiceNow AI Platform. For information about how to assign a multi-day task using Dispatcher Workspace, see [Assign work order tasks to agents](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/field-service-management/field-service-scheduling/manage-work-order-tasks-dw.md). ## Procedure 1. Navigate to **All** > **Field Service Management** > **Work Order** > **Work Order Tasks**. 2. Select the desired task for assignment. 3. Select the **Assign across the schedule entries** check box if it is not already selected. 4. Assign the task. <table id="choicetable_jln_msm_dsb"><thead><tr><th align="left" id="d128537e139"> Option </th><th align="left" id="d128537e142"> Description </th></tr></thead><tbody><tr><td id="d128537e148"> **To assign a task manually** </td><td> 1. In the **Assigned to** field, select the agent available to work on the task. 2. Click **Update**. </td></tr><tr><td id="d128537e172"> **To auto-assign a task** </td><td> 1. Click **Auto Assign** to automatically assign the task to an available agent. 2. In the Confirm Assignment dialog box, select **Confirm**. </td></tr></tbody> </table> The system calculates the estimated end date of the task based on the schedule of the selected agent. ## Result The task schedule spanning multiple schedule entries, days, or weeks is assigned to an agent.
| title | Assign multi-day tasks to agents |
| description | Assign a work order task that requires multiple schedules or days to complete the job to a field service agent. This capability avoids having to create more than one task for the same job. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/field-service-management/field-service-scheduling/assign-multi-day-task.html |
| release | brazil |
| product | Field Service Scheduling |
| classification | field-service-scheduling |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Assigning multi-day tasks to agentsScheduling and dispatchingUseField Service Management |