Create a risk assessment project

create-risk-assessment-project.md
Raw file

Create a risk assessment project to perform assessments on multiple risks and controls simultaneously using Risk Workspace. You can define the project context, includingone or more assessable entities, Risk assessment methodology (RAM), project name, description, and identify and add stakeholders.

Before you begin

Role required: sn_risk_advanced.project_user or sn_risk_workspace.operational_risk_manager or sn_risk_workspace.IT_risk_manager, or sn_risk_workspace.business_op_risk_manager

Procedure

  1. Navigate to All > Risk > Risk Workspace.

  2. Select the list [Omitted image "list-icon.png"] Alt text: list icon. icon.

  3. From the list, navigate to Risk assessment projects and select New.

  4. Select New.

  5. In the Define stage, do the following.

    1. In the Context section, fill in the fields.

      Field Description
      Risk assessment methodology Risk assessment methodology (RAM) that you use to assess risks within the project.
      Entity classes One or more entity classes that the assessable entities must belong to. Selecting a class narrows the entities available in the Assessable entities field.
      Assessable entities Single entity, composite entity, or multiple entities that need to be assessed. Only entities that belong to the selected entity classes are available.

      Note: You can't create a risk assessment project for a risk assessment methodology and entity combination that already has an active project in progress.

    2. Select Next.

    3. In the Details section, fill in the fields.

      Field Description
      Name Name of the risk assessment project. The name is automatically generated based on the selected assessable entity, followed by the current month and year, with a separator between them. You can modify the name if necessary.
      Description Description about the risk assessment project. It helps the assessors to understand the project in detail.
    4. Select Next.

    5. In the Stakeholders section, fill in the fields.

Field

Description

Owner

Name of the project owner. This field is automatically set to the user who created the project, but you can modify it if needed.

Assessor type

User or group who is responsible for assessing the project. Choices are as follows:- Users: Option to select users responsible for assessing the project.

  • Group: Option to select group of users responsible for assessing the project.
  • Entity owner: Option to select the assessable entity owner as assessor.
  • Entity stakeholder: Option to select assessor from the assessable entity stakeholders list.

Assessors

User who is responsible for assessing the project. This field appears only when Users is selected from Assessor type.

Assessor group

Group that is responsible for assessing the risk. This field appears only when Group is selected from Assessor type.

Assessors from entity

Assessors from the assessable entity stakeholders list. This field appears only when Entity stakeholder is selected from Assessor type.

Watchlist type

Users or group who can view and receive notifications about the project. Choices are as follows:- Users: Option to select users who can view and receive notifications about the project.

  • Group: Option to select group of users who can view and receive notifications about the project.
  • Entity stakeholder: Option to select watchlist users from the assessable entity stakeholders list.

Watchlist users

Users who can view and receive notifications about the project. This field appears only when Users is selected from Watchlist type.

Watchlist group

Group who can view and receive notifications about the project. This field appears only when Group is selected from Watchlist type.

Watchlist users from entity

Watchlist users from the assessable entity stakeholders list. This field appears only when Entity stakeholder is selected from Watchlist type.

**Note:** When you select more than one assessable entity, the **Entity owner** and **Entity stakeholder** options aren't available for **Assessor type** or **Watchlist type**. You can select only a single user or group as the assessor for the project.
    The project moves to the Scope risk stage and you can see a list of risks mapped from the underlying entities.
  1. To add risks in the Scope risk stage, you can do the following:

    When the project has more than one assessable entity, an Entity field lets you choose which entity a risk that you create or add belongs to.

    1. To create risks from the risk statement, select Create from risk statements.

    2. To add a risk that is not in the library, select Create ad-hoc risk.

    3. To remove risks from the assessment without deleting them from the underlying entities, select the risks, and select Remove.

      Each assessable entity must have at least one scoped risk. You can't remove the last risk that's scoped to an entity.

    4. To add any risks that have been removed, select Add risk.

  2. Select Next.

    The project moves to the Assess stage, and a notification goes to the assessor.

Parent Topic:Risk assessment project