Reassign assessor for a risk assessment project
reassign-assessor-for-risk-assessment-project.md
Reassign assessors for multiple in-progress risk assessment projects simultaneously to minimize disruptions during stakeholder transitions.
Before you begin
Role required: sn_risk_advanced.risk_asmt_project_manager
Procedure
-
Navigate to All > Risk > Risk Workspace.
-
Select the list [Omitted image "list-icon-riskworkspace.png"] Alt text: List icon. icon.
-
From the list, navigate to Risk assessment projects, and select In progress.
-
Select the Risk Assessment projects for which you want to reassign assessors.
Reassign project dialog box appears.
-
In the Reassign project dialog box, select the assessor in the Select assessor field.
-
Select Confirm.
Parent Topic:Risk assessment project
42 lines · 1.6 KB
---
title: Reassign assessor for a risk assessment project
description: Reassign assessors for multiple in-progress risk assessment projects simultaneously to minimize disruptions during stakeholder transitions.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/governance-risk-compliance/grc-risk-management-workspace/reassign-assessor-for-risk-assessment-project.html
release: brazil
product: GRC: Risk Management Workspace
classification: grc-risk-management-workspace
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Risk assessment project, Use Risk Workspace, Risk Management, Governance, Risk, and Compliance]
---
# Reassign assessor for a risk assessment project
Reassign assessors for multiple in-progress risk assessment projects simultaneously to minimize disruptions during stakeholder transitions.
## Before you begin
Role required: sn\_risk\_advanced.risk\_asmt\_project\_manager
## Procedure
1. Navigate to **All** > **Risk** > **Risk Workspace**.
2. Select the list \[Omitted image "list-icon-riskworkspace.png"\] Alt text: List icon. icon.
3. From the list, navigate to **Risk assessment projects**, and select **In progress**.
4. Select the Risk Assessment projects for which you want to reassign assessors.
Reassign project dialog box appears.
5. In the Reassign project dialog box, select the assessor in the **Select assessor** field.
6. Select **Confirm**.
**Parent Topic:**[Risk assessment project](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/governance-risk-compliance/grc-risk-management-workspace/risk-assessment-project.md)
This file has no frontmatter.