Use the Format component
Change the format of a date by using the Format component in RPA Desktop Design Studio.
Before you begin
Role required: none
About this task
You can configure the properties for the Format component. For more information about these properties, see Properties of the DateTime components.
Procedure
-
In the Toolbox pane, navigate to Utilities > DateTime.
-
Drag the Format component to the Design surface.
-
Click the component settings icon ([Omitted image "component-settings-icon.png"] Alt text: Component settings icon).
-
Do the following:
-
In the From field, specify the date format you want to change.
-
In the To field, specify the destination date format.
-
Click OK.
-
-
To configure the input field, see Configure port properties.
-
Connect the data and control ports of the Format component to the corresponding ports of the other components as described in the following table.
|
Port type |
Purpose of connection |
Mandatory? |
|---|---|---|
|
Data In (DateObject) |
Passes the date object through the Data Out port of another component. For example, 03-25-2009. |
Yes |
|
Data Out |
Returns the date object in the destination date format. |
Yes.To preview the data, right-click the Return field and click Preview Data. |
|
Control In |
Connects to the Control Out port of one or more components. |
Yes |
|
Control Out |
Connects to the Control In port of any other component. |
No. Connecting the port is optional. |
Parent Topic:DateTime
---
title: Use the Format component
description: Change the format of a date by using the Format component in RPA Desktop Design Studio.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/integrate-applications/use-datetime-compare.html
release: brazil
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [DateTime, Utilities, Automation components, RPA Desktop Design Studio, Robotic Process Automation \(RPA\) Hub, Workflow Data Fabric]
---
# Use the Format component
Change the format of a date by using the Format component in RPA Desktop Design Studio.
## Before you begin
Role required: none
## About this task
You can configure the properties for the Format component. For more information about these properties, see [Properties of the DateTime components](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/integrate-applications/util-datetime-prop.md).
## Procedure
1. In the Toolbox pane, navigate to **Utilities** > **DateTime**.
2. Drag the Format component to the Design surface.
3. Click the component settings icon \(\[Omitted image "component-settings-icon.png"\] Alt text: Component settings icon\).
4. Do the following:
1. In the From field, specify the date format you want to change.
2. In the To field, specify the destination date format.
3. Click **OK**.
5. To configure the input field, see [Configure port properties](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/integrate-applications/configure-input-port-properties.md).
6. Connect the data and control ports of the Format component to the corresponding ports of the other components as described in the following table.
<table id="table_jnw_jn1_krb"><thead><tr><th>
Port type
</th><th>
Purpose of connection
</th><th>
Mandatory?
</th></tr></thead><tbody><tr><td>
Data In \(DateObject\)
</td><td>
Passes the date object through the Data Out port of another component. For example, 03-25-2009.
</td><td>
Yes
</td></tr><tr><td>
Data Out
</td><td>
Returns the date object in the destination date format.
</td><td>
Yes.To preview the data, right-click the **Return** field and click **Preview Data**.
</td></tr><tr><td>
Control In
</td><td>
Connects to the Control Out port of one or more components.
</td><td>
Yes
</td></tr><tr><td>
Control Out
</td><td>
Connects to the Control In port of any other component.
</td><td>
No. Connecting the port is optional.
</td></tr></tbody>
</table>7. To test the component, under the **DESIGN** tab, click **Run**.
**Parent Topic:**[DateTime](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/integrate-applications/datetime-utility.md)
| title | Use the Format component |
| description | Change the format of a date by using the Format component in RPA Desktop Design Studio. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/integrate-applications/use-datetime-compare.html |
| release | brazil |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | DateTimeUtilitiesAutomation componentsRPA Desktop Design StudioRobotic Process Automation \(RPA\) HubWorkflow Data Fabric |