Quick start tests for Agile Development 2.0

reference brazil Updated Sep 10, 2026 3 min read quick-start-tests-agiledevelopment2.0.md
Raw file servicenow.com

Validate that Agile Development 2.0 still works after you make any configuration change such as apply an upgrade or develop an application. Copy and customize these quick start tests to pass when using your instance-specific data.

Danger

By default, the system property that is used to run automated tests is disabled to prevent you from accidentally running these tests on a production system. To avoid data corruption or an outage, run tests only on development, test, and other non-production instances. See Enable or disable executing Automated Test Framework tests.

Agile Development 2.0 quick start tests require activating the Agile Development 2.0 plugin (com.snc.sdlc.agile.2.0) and the Agile Development 2.0 - ATF Tests plugin (com.snc.sdlc.agile.2.0.atf ).

Test

Description

Release version

Verify that global rank is populated when a story is created

Verify the global rank of a story after creation.

Madrid

Verify that closing a sprint with active stories is prevented

Verify that a sprint with active stories cannot be closed.

Madrid

Verify that sprints cannot overlap in the same group

Verify that sprints in the same group do not overlap.

Madrid

Verify that sprint points are updated

Verify that changes to stories produce accurate sprint point totals.

Madrid

Verify that only one sprint in a group can have the current state

Verify sprint statuses.

Madrid

Verify sprint end date is after the sprint start date

Verify sprint start and end dates.

Madrid

Verify that any update on story rolls up to Epic

Verify that adding, estimating, removing, deleting, updating, or cancelling a story updates the epic-level roll-ups correctly.

Orlando

Verify changes to the scope of a current sprint do not alter the value of the Total Committed Points

Verify that the value of Total Committed Points does not change with change in the scope of a sprint after its state is changed to Current.

Orlando

Verify active flag is set false when Agile Story state is changed to Completed/Cancelled

Verify that active flag of an Agile story is set to the following: - False, if the state is changed to Completed or Cancelled

  • True, for all other states

Orlando

Verify that updating the team/group capacity overrides the capacity on all the future sprints

Verify that any update to the Group capacity field of the assignment group results in the following changes to the Group capacity field of the various sprints associated with this assignment group:

  • For the sprints that are in the Draft and Planning state:
    • The group capacity is updated to the new value.
    • The Group capacity field is editable.
  • For the sprints in the Current, Complete, or Cancelled state:
    • The group capacity remains the old value.
    • The Group capacity field is read-only.

For the sprints in the Draft or Planning state, you can individually edit the group capacity of the sprint anytime later. This would not change the group capacity of the assignment group associated with this sprint.

Paris

Verify create and edit functionality of an epic backlog on the scrum program board

  • Verify that you can create an epic backlog for scrum programs from the Backlog tab of Agile Board.
  • Verify that you can update an existing epic backlog for scrum programs from the Backlog tab of Agile Board.
  • The epics listed in the backlog must belong to the selected epic backlog.

Quebec

Verify a Demand is converted to a scrum story

If the PPM Standard plugin (com.snc.financial_planning_pmo) is active, verify that a Demand can be converted to an Agile 2.0 story using the Create Story related link on the Demand form. For more information on how to create an Agile 2.0 story from a demand, see Create an artifact from a demand.

Quebec

Verify a Demand is converted to a scrum epic

If the PPM Standard plugin (com.snc.financial_planning_pmo) is active, verify that a Demand can be converted to an Agile 2.0 epic using the Create Epic related link on the Demand form.For more information on how to create an Agile 2.0 epic from a demand, see Create an artifact from a demand.

Quebec

**Related topics**

Quick start tests

Search documentation
Search document titles and file paths on the brazil branch