Target form

reference brazil Updated Sep 10, 2026 10 min read target-form.md
Raw file servicenow.com

Use the Target form to track and measure the progress of the goals.

Some of the fields on the form is available when the Goal Framework for SPM application is installed.

Note: For Operational Sustainability Workspace and Strategic Planning users, to view the other fields that aren't added to the default view or your custom form view on the form in the workspace, configure the default or custom form layout. For information on how to configure the form layout, see Configuring the form layout.

Field

Description

Number

Unique identifier of the target. The number is generated automatically, for example, TRGT0005678. An administrator can change the prefix. For more information, see Change the number prefix for goals and targets.

Name

Name of the target.

Goal

Name of the associated goal. This field is auto-populated when creating a target from the Targets related list on the Goal form.

Description

Brief description of the target.You can refine target description using the Refine records skill, if the ServiceNow Otto for SPM application is installed.

State

State of the target. The state can be Draft, In progress, Approved, Complete, Pending, Achieved, Not Achieved, or Cancelled.

Status

Status of the target. The status can be Red, Yellow, Green, or No status.

Progress

Percentage of target execution that is complete. The value is calculated automatically.If the Type field is set to Maximize, the progress value is calculated using the following formula.

Text
Progress = (Actual value - Base value) / (Target value - Base value) x 100

If the Type field is set to Minimize, the progress value is calculated using the following formula.

Text
Progress = (Base value - Actual value) / (Base value - Target value) x 100

If the Type field is set to Maintain above, Maintain below, or Maintain constant, the progress is 100% or 0% for a target without target breakdowns, based on whether the actual value meets the final target value. For a target with target breakdowns, the progress is the percentage of target breakdown periods in which the target is met. For more information, see Target types and achievement strategies.

For more information on how the progress value is calculated when weight scale is defined, see progress value calculation.

Impact on goal

A numerical value that represents the importance of the target relative to the other targets of the goal. If there are any sub-goals present, they are also considered for relative weights and consequent progress calculation. By default, the value is (1) Neutral.The available options are:

  • (0) No impact
  • (1) Neutral
  • (2) Moderate
  • (3) High
  • (4) Very high
  • (5) Maximum

Note: This field is available only when the sn_gf.weighted_average_enabled system property is set to Yes.

Assigned entity type

Entity type to which the target is assigned. For example, Business Unit, Department, Company, or Portfolio.

Assigned entity

Entity to which the target is assigned.

Owner

Owner of the target. By default, the name of the user creating the target is populated.

Contributors

Users who contribute to the achievement of the target. By default, the contributors of the associated goal are populated.

|Field|Description| |-----|-----------| |Start date|Start date for the target. By default, the start date of its associated goal is populated.| |End date|End date for the target. By default, the end date of its associated goal is populated.|

Field

Description

Unit of measure

Measure type for the specified value. Usage of the measure such as cost, time, and rate. The available measure types are stored in the Units [sn_gf_units] table. Unit of measure defines the type of the target as qualitative or quantitative. The available unit of measures for quantitative target are #, $, %, and Days. The available unit of measure for qualitative target is Yes/No.

Type

Target type that signifies the direction of achievement.- Maximize: The direction of the progress is toward the target value from the base value where the base value must be less than the target value.

  • Minimize: The direction of the progress is toward the target value from the base value where the target value must be less than the base value.
  • Maintain above: The actual value must stay at or above the final target value in each period.
  • Maintain below: The actual value must stay at or below the final target value in each period.
  • Maintain constant: The actual value must stay within a tolerance band around the final target value in each period.
  • Milestone: Fixed type. Only the qualitative target values are allowed (that are set in the Unit of measure field for the target) to capture the achievement of the target. The Milestone option is applicable only for qualitative targets.

The Type and Unit of measure fields stay in sync. When you select Milestone, the Unit of measure field is set to a qualitative unit of measure, Yes/No by default. When you select any other type, the Unit of measure field is set to the last quantitative unit of measure used for the target, or to Count(#) if none was used.

You can change the type of a target that already has actual values. A confirmation message appears before the change is applied. When you change between two Maintain types, the actual value is kept. When you change between Maximize, Minimize, and a Maintain type, the actual value and progress of the target are cleared, and any target breakdowns are regenerated. When you change to Milestone, any target breakdowns are deleted.

Start value

Start value of the target. The start value can also be considered as the present or current value.This field becomes read-only when a value is entered in the Actual value field. Clear the Actual value field to update a value in the Base value field.

This field is available when the Type field is set to Maximize or Minimize.

Final target value

Final target value of the target. The target value should be aspirational and should challenge the teams.This field is available when the Type field is set to Maximize, Minimize, Maintain above, Maintain below, or Maintain constant.

Baseline reference

Past achievement of the target to provide reference for future performance. This value is only for reference purpose and not considered for target progress calculation.

Actuals to date

Actual value of the target at a given time.This field is available when the Type field is set to Maximize, Minimize, Maintain above, Maintain below, or Maintain constant. For a Maintain type target with target breakdowns, this value is the actual value of the latest target breakdown that has an actual value.

Check-in frequency

Option to specify breakdown intervals for the target and how frequently the owner or contributor should update the actual value of the target. Breaking down the target into smaller periods helps you set a target for smaller periods and focus on the specific breakdown targets. The available options are Daily, Weekly, Monthly, Quarterly, Period (fiscal mode only), and Yearly. Target breakdowns are automatically created when you set this field to any of the available options other than None. For more details on target breakdowns, see Target breakdowns.Note: The target breakdowns feature isn’t supported for qualitative targets.

The options you see depend on the calendar type. On a fiscal calendar, the list shows only the frequencies that the fiscal period structure supports, for example Period, Quarterly, and Yearly on a 4-4-5 calendar. On a Gregorian calendar, the list shows Daily, Weekly, Monthly, Quarterly, and Yearly, and the default is Quarterly. When a new target opens with an unsupported value, the field is set to the calendar default. For a stale target, this field is read-only, except that you can set it to None. For more information, see Fiscal calendar support for targets.

Target value distribution

Option to specify the target to be calculated cumulatively or non-cumulatively. The available options are Split equally across the time period (non-cumulative) and Spread linearly across the time period (cumulative).This field is available only when the Check-in frequency field is set to any of the available options other than None.

This field is hidden and cleared when the Type field is set to Milestone, Maintain above, Maintain below, or Maintain constant.

Remark

Remark entered by the user for business justification when updating the actuals.

Check-in due date

Due date that the owner or contributor of the target must update the actual value of the target to.

Confidential

Option to restrict the access for this target record to the specific users populated in the Allowed groups and Allowed users fields.This field is available when the Operational Sustainability Management application is installed and the sn_grc.enable_record_confidentiality property is enabled. This field is applicable only when the Classification field in the goal form of the target is populated as Environmental, Social, or Governance. The required role to configure this field is sn_esg.reader.

Note: Irrespective of the target record set to confidential or not, the target progress value rolls up to its goal for calculating the progress value of the goal.

Allowed groups

User groups who can access the target record. This field is applicable only for the Operational Sustainability Workspace users.Even though a user group is populated in this field, the users can access the confidential record only if the user group has the sn_esg.reader role.

This field is available when the Confidential field is set to true.

Allowed users

Users who can access the target record. This field is applicable only for the Operational Sustainability Workspace users.Even though a user name is populated in this field, the user can access the confidential record only if the user has the sn_esg.reader role.

This field is available when the Confidential field is set to true.

Comments

Detailed comments for the target to facilitate collaboration.

Field

Description

Automate actual value

Option to enable the target automation feature for the target.

Actual value source

Target source table that the data is fetched from to auto-update the actual value of the target on the target's review due date.This field is available when the Automate actual value field is set to true.

## Variables section of the Target form

This section appears based on the context variables available in the target source that is selected in the Actual value source field.

When you select Actual value source as Benefit Plans (predefined target automation script for benefit plans), the Benefit Plan field appears in this section, from which you can select the required benefit plans for automating the actual value of the target.

Note: You can use the Benefit Plans custom script only when PPM Standard (Project Portfolio Management) is installed. If you can't find the benefit plan that you want to select, you can find and select the same from Heisenberg UI by navigate to Enterprise Goal Management > Targets and opening the Target form.

Parent Topic:Goal Framework and Goal Framework for SPM reference