Manage your portfolio backlog
Manage, evaluate, prioritize, and sequence epics in your portfolio backlog.
Before you begin
Role required: sn_portfolio_safe.safe_portfolio_user
Procedure
-
Navigate to All > Scaled Agile Framework (SAFe) > SAFe Board.
-
From the choice list at the top left corner, select the level as Portfolio.
-
Click the Backlog tab.
-
To add an epic at the bottom of the backlog.
-
Click Create Epic.
-
Specify the required details in the form and click Submit.
-
-
To add an epic while simultaneously deciding its order of implementation in the backlog.
-
Select an epic in the backlog.
-
Click Create Epic.
-
Specify the required details in the form and click Submit.
The epic is created beneath the epic that was selected in the backlog.
-
-
To search for epics by their short descriptions, type a word in the search box and press Enter.
-
To arrange epics within the backlog, use either of the following options.
|
Action |
Description |
|---|---|
|
Using the drag feature |
Point to an epic and drag it to the required position. |
|
Using the keyboard |
|
-
To view the backlog as a standard platform list, click View Standard List.
-
To perform any action on a set of epics.
- Select the required epics.
- Click [Omitted image "ellipsis.png"] Alt text: Icon used to perform a single action on multiple features and select any of the following options: |Option|Description| |------|-----------| |Move to top|Epics are placed at the top of the backlog section.| |Move to bottom|Epics are placed at the bottom of the backlog section.|
Parent Topic:SAFe Board—Portfolio level
---
title: Manage your portfolio backlog
description: Manage, evaluate, prioritize, and sequence epics in your portfolio backlog.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/it-business-management/scaled-agile-framework-safe/manage-your-portfolio-backlog.html
release: brazil
product: Scaled Agile Framework \(SAFe\)
classification: scaled-agile-framework-safe
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [SAFe Board—Portfolio level, Portfolio SAFe, Scaled Agile Framework \(SAFe\), Strategic Portfolio Management]
---
# Manage your portfolio backlog
Manage, evaluate, prioritize, and sequence epics in your portfolio backlog.
## Before you begin
Role required: sn\_portfolio\_safe.safe\_portfolio\_user
## Procedure
1. Navigate to **All** > **Scaled Agile Framework \(SAFe\)** > **SAFe Board**.
2. From the choice list at the top left corner, select the level as **Portfolio**.
3. Click the **Backlog** tab.
4. To add an epic at the bottom of the backlog.
1. Click **Create Epic**.
2. Specify the required details in the form and click **Submit**.
5. To add an epic while simultaneously deciding its order of implementation in the backlog.
1. Select an epic in the backlog.
2. Click **Create Epic**.
3. Specify the required details in the form and click **Submit**.
The epic is created beneath the epic that was selected in the backlog.
6. To search for epics by their short descriptions, type a word in the search box and press **Enter**.
7. To arrange epics within the backlog, use either of the following options.
<table id="choicetable_pgt_smy_p1b"><thead><tr><th align="left" id="d200564e161">
Action
</th><th align="left" id="d200564e164">
Description
</th></tr></thead><tbody><tr><td id="d200564e170">
**Using the drag feature**
</td><td>
Point to an epic and drag it to the required position.
</td></tr><tr><td id="d200564e179">
**Using the keyboard**
</td><td>
1. Press the **Tab** key.
2. After the desired epic is highlighted, press the **Tab** key.
3. After the \[Omitted image "draganddropicon.png"\] Alt text: Icon used to move the record icon is highlighted, press the **Enter** key.
4. After the \[Omitted image "plansprintactivity.png"\] Alt text: Icon used to move the record icon appears, use the up and down arrow keys.
5. To fix the position of the epic, press the **Enter** key.
</td></tr></tbody>
</table> If the backlog contains more than 50 epics, then a pagination control appears at the bottom of the list enabling you to navigate to the first, last, previous, or next page in the list.
8. To view the backlog as a standard platform list, click **View Standard List**.
9. To perform any action on a set of epics.
- Select the required epics.
- Click \[Omitted image "ellipsis.png"\] Alt text: Icon used to perform a single action on multiple features and select any of the following options:
|Option|Description|
|------|-----------|
|**Move to top**|Epics are placed at the top of the backlog section.|
|**Move to bottom**|Epics are placed at the bottom of the backlog section.|
**Parent Topic:**[SAFe Board—Portfolio level](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/it-business-management/scaled-agile-framework-safe/portfolio-tabs.md)
| title | Manage your portfolio backlog |
| description | Manage, evaluate, prioritize, and sequence epics in your portfolio backlog. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/it-business-management/scaled-agile-framework-safe/manage-your-portfolio-backlog.html |
| release | brazil |
| product | Scaled Agile Framework \(SAFe\) |
| classification | scaled-agile-framework-safe |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | SAFe Board—Portfolio levelPortfolio SAFeScaled Agile Framework \(SAFe\)Strategic Portfolio Management |