Agent Client Collector deployment checklist
Successful Agent Client Collector (ACC) implementations, especially involving large numbers of endpoints or servers, require careful deployment. When proceeding with a large-scale ACC deployment, follow the steps described in the deployment checklist.
|
Step number |
Action |
Description |
|---|---|---|
|
1 |
Update production and sub-production instances |
Ensure that all instances are updated to the most recent store applications, family releases, or both. |
|
2 |
Assess instance capacity |
Open support tickets if additional instance capacity is needed for the projected number of ACC agents. |
|
3 |
Deploy and configure MID Servers when required |
If connecting over 1,000 ACC agents to a single MID Server, assess performance and whether a load balancer in front of a MID Server is needed. |
|
4 |
Verify whether ITOM Cloud Services (ICS) is required and, if so, whether it is configured |
Some use cases (such as DEX) always require ICS. |
|
5 |
Download appropriate installer files from the instance |
Installer files may be in one of the following formats:- .rpm
|
|
6 |
Define a deployment calendar |
Share deployment groups and group size, assignments, start/stop, success gates, go/no-go signers, and rollback criteria with stakeholders. |
|
7 |
Package ACC in appropriate software management tools |
Software management tools include:- Intune
|
|
8 |
Deploy pilot and test environments on sub-production instances using your preferred software management tool |
In test and pilot environments, you can test multiple operating systems and hardware combinations (such as server vs. laptop). |
|
9 |
Monitor the ServiceNow instance and the software management solution |
|
|
10 |
Assess data collection, install success rate, and instance performance over the next 2-3 business days |
Workloads and data collection can vary significantly, depending on the time of day; therefore, monitor deployment success over several days. |
|
11 |
Update deployment calendar and continue with next install cohorts |
After successful deployment, continue with data collection. |
--- title: Agent Client Collector deployment checklist description: Successful Agent Client Collector \(ACC\) implementations, especially involving large numbers of endpoints or servers, require careful deployment. When proceeding with a large-scale ACC deployment, follow the steps described in the deployment checklist. locale: en-US canonical_url: https://www.servicenow.com/docs/r/it-operations-management/agent-client-collector/acc-deployment-checklist.html release: brazil product: Agent Client Collector classification: agent-client-collector topic_type: concept last_updated: "2026-09-10" reading_time_minutes: 1 breadcrumb: [Preparing for Agent Client Collector implementation, Configuring Agent Client Collector, Agent Client Collector, IT Operations Management] --- # Agent Client Collector deployment checklist Successful Agent Client Collector \(ACC\) implementations, especially involving large numbers of endpoints or servers, require careful deployment. When proceeding with a large-scale ACC deployment, follow the steps described in the deployment checklist. <table id="table_hvf_bwk_3hc"><thead><tr><th> Step number </th><th> Action </th><th> Description </th></tr></thead><tbody><tr><td align="center"> 1 </td><td> Update production and sub-production instances </td><td> Ensure that all instances are updated to the most recent store applications, family releases, or both. </td></tr><tr><td align="center"> 2 </td><td> Assess instance capacity </td><td> Open support tickets if additional instance capacity is needed for the projected number of ACC agents. </td></tr><tr><td align="center"> 3 </td><td> Deploy and configure MID Servers when required </td><td> If connecting over 1,000 ACC agents to a single MID Server, assess performance and whether a load balancer in front of a MID Server is needed. </td></tr><tr><td align="center"> 4 </td><td> Verify whether ITOM Cloud Services \(ICS\) is required and, if so, whether it is configured </td><td> Some use cases \(such as DEX\) always require ICS. </td></tr><tr><td align="center"> 5 </td><td> Download appropriate installer files from the instance </td><td> Installer files may be in one of the following formats:- .rpm - .msi - .pkg </td></tr><tr><td align="center"> 6 </td><td> Define a deployment calendar </td><td> Share deployment groups and group size, assignments, start/stop, success gates, go/no-go signers, and rollback criteria with stakeholders. </td></tr><tr><td align="center"> 7 </td><td> Package ACC in appropriate software management tools </td><td> Software management tools include:- Intune - jamf </td></tr><tr><td align="center"> 8 </td><td> Deploy pilot and test environments on sub-production instances using your preferred software management tool </td><td> In test and pilot environments, you can test multiple operating systems and hardware combinations \(such as server vs. laptop\). </td></tr><tr><td align="center"> 9 </td><td> Monitor the ServiceNow instance and the software management solution </td><td> - On the instance, monitor the performance and rate limit violations. - On the software management solution, monitor the deployment success rate. </td></tr><tr><td align="center"> 10 </td><td> Assess data collection, install success rate, and instance performance over the next 2-3 business days </td><td> Workloads and data collection can vary significantly, depending on the time of day; therefore, monitor deployment success over several days. </td></tr><tr><td align="center"> 11 </td><td> Update deployment calendar and continue with next install cohorts </td><td> After successful deployment, continue with data collection. </td></tr></tbody> </table>**Parent Topic:**[Preparing for Agent Client Collector implementation](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/it-operations-management/agent-client-collector/acc-preparation.md)
| title | Agent Client Collector deployment checklist |
| description | Successful Agent Client Collector \(ACC\) implementations, especially involving large numbers of endpoints or servers, require careful deployment. When proceeding with a large-scale ACC deployment, follow the steps described in the deployment checklist. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/it-operations-management/agent-client-collector/acc-deployment-checklist.html |
| release | brazil |
| product | Agent Client Collector |
| classification | agent-client-collector |
| topic_type | concept |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Preparing for Agent Client Collector implementationConfiguring Agent Client CollectorAgent Client CollectorIT Operations Management |