CoPQ planned line charge form
The CoPQ planned line charge form contains fields for defining planned costs on a CoPQ financial request.
|
Field |
Description |
|---|---|
|
Number |
CoPQ planned line charge number that is automatically generated. The number starts with PLC and is incremented for every new report. |
|
State |
State of the planned line charge:- New
|
|
Financial request |
Financial request that links planned line charge to the parent CoPQ financial request. |
|
CoPQ type |
CoPQ type that categorizes the cost as material/part-related or labor-related. |
|
Product model |
Model type. |
|
Quantity |
Quantity of the item/service planned. |
|
Unit of measure |
Number of product quantities. |
|
Unit cost |
Cost of each product. |
|
Planned cost |
Planned cost allocated to address the issue through the request. |
|
Actual cost |
Actual cost incurred for the CoPQ request. |
--- title: CoPQ planned line charge form description: The CoPQ planned line charge form contains fields for defining planned costs on a CoPQ financial request. locale: en-US canonical_url: https://www.servicenow.com/docs/r/manufacturing/mco-copq-planned-line-charge-form.html release: brazil topic_type: reference last_updated: "2026-09-10" reading_time_minutes: 1 keywords: [CoPQ, cost of poor quality, planned line charge, CoPQ financial request, quality issue management] breadcrumb: [Quality issue management form, Reference, Manufacturing Commercial Operations] --- # CoPQ planned line charge form The CoPQ planned line charge form contains fields for defining planned costs on a CoPQ financial request. <table id="table_uky_wgq_xhc"><thead><tr><th> Field </th><th> Description </th></tr></thead><tbody><tr><td> Number </td><td> CoPQ planned line charge number that is automatically generated. The number starts with PLC and is incremented for every new report. </td></tr><tr><td> State </td><td> State of the planned line charge:- New - On hold - In progress - Closed complete - Closed canceled - Closed incomplete </td></tr><tr><td> Financial request </td><td> Financial request that links planned line charge to the parent CoPQ financial request. </td></tr><tr><td> CoPQ type </td><td> CoPQ type that categorizes the cost as material/part-related or labor-related. </td></tr><tr><td> Product model </td><td> Model type. </td></tr><tr><td> Quantity </td><td> Quantity of the item/service planned. </td></tr><tr><td> Unit of measure </td><td> Number of product quantities. </td></tr><tr><td> Unit cost </td><td> Cost of each product. </td></tr><tr><td> Planned cost </td><td> Planned cost allocated to address the issue through the request. </td></tr><tr><td> Actual cost </td><td> Actual cost incurred for the CoPQ request. </td></tr></tbody> </table>**Parent Topic:**[Quality issue management form](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-qim-form.md)
| title | CoPQ planned line charge form |
| description | The CoPQ planned line charge form contains fields for defining planned costs on a CoPQ financial request. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/manufacturing/mco-copq-planned-line-charge-form.html |
| release | brazil |
| topic_type | reference |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| keywords | CoPQcost of poor qualityplanned line chargeCoPQ financial requestquality issue management |
| breadcrumb | Quality issue management formReferenceManufacturing Commercial Operations |