Merge two or more phases
Merge phases and sub-phases to reorganize and transfer assets.
Before you begin
Role required: sn_rcl_claim_mgmt.recall_manager and sn_rcl_claim_mgmt.recall_phase_owner
Procedure
-
Navigate to Workspaces > CRM Workspace > Lists > Recall Management > My Campaigns.
-
Select the Recall campaign phase and open it in details view.
-
Select Merge and Cancel phase.
All the active campaign phases that are in either the Draft state or the Pre-launched state can be merged.
The Merge assets to another phase and cancel current phase window displays.
-
Select Move assets to phase or sub-phase from the list.
-
Select OK.
Note: Only phases or sub-phases without a child phase can be merged.
Result
The current phase or sub-phase state is canceled, and all associated assets are transferred to the target phase.
Parent Topic:Recall management
---
title: Merge two or more phases
description: Merge phases and sub-phases to reorganize and transfer assets.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/manufacturing/mco\_merge\_phases.html
release: brazil
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
keywords: [merge phases, merge sub-phases, cancel phase, recall campaign phase, Manufacturing Commercial Operations]
breadcrumb: [Recall management, MCO workspace, Use, Manufacturing Commercial Operations]
---
# Merge two or more phases
Merge phases and sub-phases to reorganize and transfer assets.
## Before you begin
Role required: sn\_rcl\_claim\_mgmt.recall\_manager and sn\_rcl\_claim\_mgmt.recall\_phase\_owner
## Procedure
1. Navigate to **Workspaces** > **CRM Workspace** > **Lists** > **Recall Management** > **My Campaigns**.
2. Select the Recall campaign phase and open it in details view.
3. Select **Merge and Cancel phase**.
All the active campaign phases that are in either the Draft state or the Pre-launched state can be merged.
The Merge assets to another phase and cancel current phase window displays.
4. Select **Move assets to phase or sub-phase** from the list.
5. Select **OK**.
**Note:** Only phases or sub-phases without a child phase can be merged.
## Result
The current phase or sub-phase state is canceled, and all associated assets are transferred to the target phase.
**Parent Topic:**[Recall management](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-recall-management.md)
| title | Merge two or more phases |
| description | Merge phases and sub-phases to reorganize and transfer assets. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/manufacturing/mco\_merge\_phases.html |
| release | brazil |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| keywords | merge phasesmerge sub-phasescancel phaserecall campaign phaseManufacturing Commercial Operations |
| breadcrumb | Recall managementMCO workspaceUseManufacturing Commercial Operations |