Create a phase and sub-phase in a recall campaign
Create a set of phases and sub-phase within a recall campaign to enable detailed segmentation, improving tracking, and management at each stage of the process.
Before you begin
Role required: sn_rcl_claim_mgmt.recall_manager and sn_rcl_claim_mgmt.recall_phase_owner
Procedure
-
Navigate to Workspaces > CRM Workspace > Lists > Recall Management > My Campaigns
-
Select the corresponding campaign record in which you want to create the phases and sub-phases.
-
Select Phases & Sub-phases.
The page displays the following:
-
Total impacted assets: The total number of impacted assets associated with the campaign.
For example: Total impacted assets = campaign assets (which includes phase assets + sub-phase assets).
-
Assigned impacted assets: The total number of impacted assets in a given leaf-level phase or sub-phase.
For example, assigned impacted assets = phase assets (leaf) + sub-phase assets (leaf).
-
Unassigned impacted assets: The total number of impacted assets that are associated with phases or sub-phases that aren’t at the leaf-level.
For example: Unassigned impacted assets = phase assets (non-leaf) + sub-phase assets (non-leaf).
Note: Unassigned assets on a parent phase are the assets that are assigned to the parent phase but not to any leaf phase.
-
-
Select Add phase.
-
On the required recall campaign phase form, fill in the fields.
For a description of the field values, see Recall campaign phase form.
-
Select Save.
Related list Description Assign an impacted asset Assign an impacted asset to the recall campaign. Adding a phase task Agents workspace enables the manufacturers to add the phase task details for the recall campaigns. Adding a sub-phase Create a sub-phase for a parent phase. -
Add a sub-phase by selecting the plus icon (+).
The Recall Campaign Phase window is displayed.
-
On the recall campaign phases form, fill in the fields.
For a description of the field values, see Recall campaign phase form.
-
Select Submit.
Parent Topic:Recall a campaign phase
---
title: Create a phase and sub-phase in a recall campaign
description: Create a set of phases and sub-phase within a recall campaign to enable detailed segmentation, improving tracking, and management at each stage of the process.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/manufacturing/mco\_phases\_sub-phases.html
release: brazil
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Recall a campaign phase, Create a campaign, Recall management, MCO workspace, Use, Manufacturing Commercial Operations]
---
# Create a phase and sub-phase in a recall campaign
Create a set of phases and sub-phase within a recall campaign to enable detailed segmentation, improving tracking, and management at each stage of the process.
## Before you begin
Role required: sn\_rcl\_claim\_mgmt.recall\_manager and sn\_rcl\_claim\_mgmt.recall\_phase\_owner
## Procedure
1. Navigate to **Workspaces** > **CRM Workspace** > **Lists** > **Recall Management** > **My Campaigns**
2. Select the corresponding campaign record in which you want to create the phases and sub-phases.
3. Select **Phases & Sub-phases**.
The page displays the following:
- Total impacted assets: The total number of impacted assets associated with the campaign.
For example: Total impacted assets = campaign assets \(which includes phase assets + sub-phase assets\).
- Assigned impacted assets: The total number of impacted assets in a given leaf-level phase or sub-phase.
For example, assigned impacted assets = phase assets \(leaf\) + sub-phase assets \(leaf\).
- Unassigned impacted assets: The total number of impacted assets that are associated with phases or sub-phases that aren’t at the leaf-level.
For example: Unassigned impacted assets = phase assets \(non-leaf\) + sub-phase assets \(non-leaf\).
**Note:** Unassigned assets on a parent phase are the assets that are assigned to the parent phase but not to any leaf phase.
4. Select **Add phase**.
5. On the required recall campaign phase form, fill in the fields.
For a description of the field values, see [Recall campaign phase form](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-recall-campaign-phases-form.md).
6. Select **Save**.
|Related list|Description|
|------------|-----------|
|[Assign an impacted asset](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco_assign_impacted_asset.md)|Assign an impacted asset to the recall campaign.|
|[Adding a phase task](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-phase-task.md)|Agents workspace enables the manufacturers to add the phase task details for the recall campaigns.|
|[Adding a sub-phase](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco_recall_campaign_phases.md)|Create a sub-phase for a parent phase.|
7. Add a sub-phase by selecting the plus icon \(+\).
The Recall Campaign Phase window is displayed.
8. On the recall campaign phases form, fill in the fields.
For a description of the field values, see [Recall campaign phase form](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-recall-campaign-phases-form.md).
9. Select **Submit**.
**Parent Topic:**[Recall a campaign phase](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/manufacturing/mco-recall-campaign-phases.md)
| title | Create a phase and sub-phase in a recall campaign |
| description | Create a set of phases and sub-phase within a recall campaign to enable detailed segmentation, improving tracking, and management at each stage of the process. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/manufacturing/mco\_phases\_sub-phases.html |
| release | brazil |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Recall a campaign phaseCreate a campaignRecall managementMCO workspaceUseManufacturing Commercial Operations |