Configure an indicator by threshold, weightage, and order
task brazil Updated Sep 10, 2026 1 min read configure-indicator-by-threshold-weightage-order-otpsc.md
Configure the Operational Technology (OT) Progress Scorecard indicators so that the display of each indicator meets your needs.
Before you begin
Role required: ot_progress_scorecard_editor or configure_industrial_workspace
About this task
You can configure the following indicators.
- Overall Score (%)
- % of Expected OT Devices in CMDB
- Classified OT Devices (%)
- Assigned OT Devices (%)
- OT Device Data Completeness (%)
- Mapped OT Devices (%)
- Backed up OT Devices (%)
- Approved OT Change Requests (%)
- OT Incidents with OT Context (%)
Procedure
-
Navigate to All > Industrial Workspace Admin > OT Progress Scorecard Config.
-
Select the indicator you want to edit.
-
On the form, fill in the following fields.
Field Description Low Threshold The lowest threshold that the indicator can meet. High threshold The highest threshold that the indicator can meet. Weightage The total weightage that the indicator contributes to the overall score. Order The rank of the indicator by importance from left to right. -
If you do not need an indicator to be shown, set de-select the Active field.
-
Select Update.
Parent Topic:Setting up the Operational Technology Progress Scorecard
59 lines · 2.2 KB
---
title: Configure an indicator by threshold, weightage, and order
description: Configure the Operational Technology \(OT\) Progress Scorecard indicators so that the display of each indicator meets your needs.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/operational-technology/industrial-workspace/configure-indicator-by-threshold-weightage-order-otpsc.html
release: brazil
product: Industrial Workspace
classification: industrial-workspace
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Setting up the Operational Technology Progress Scorecard, Configure, Industrial Workspace, Operational Technology]
---
# Configure an indicator by threshold, weightage, and order
Configure the Operational Technology \(OT\) Progress Scorecard indicators so that the display of each indicator meets your needs.
## Before you begin
Role required: ot\_progress\_scorecard\_editor or configure\_industrial\_workspace
## About this task
You can configure the following indicators.
- Overall Score \(%\)
- % of Expected OT Devices in CMDB
- Classified OT Devices \(%\)
- Assigned OT Devices \(%\)
- OT Device Data Completeness \(%\)
- Mapped OT Devices \(%\)
- Backed up OT Devices \(%\)
- Approved OT Change Requests \(%\)
- OT Incidents with OT Context \(%\)
## Procedure
1. Navigate to **All** > **Industrial Workspace Admin** > **OT Progress Scorecard Config**.
2. Select the indicator you want to edit.
3. On the form, fill in the following fields.
|Field|Description|
|-----|-----------|
|Low Threshold|The lowest threshold that the indicator can meet.|
|High threshold|The highest threshold that the indicator can meet.|
|Weightage|The total weightage that the indicator contributes to the overall score.|
|Order|The rank of the indicator by importance from left to right.|
4. If you do not need an indicator to be shown, set de-select the **Active** field.
5. Select **Update**.
**Parent Topic:**[Setting up the Operational Technology Progress Scorecard](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/operational-technology/industrial-workspace/setting-up-the-ot-progress-scorecard.md)
| title | Configure an indicator by threshold, weightage, and order |
| description | Configure the Operational Technology \(OT\) Progress Scorecard indicators so that the display of each indicator meets your needs. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/operational-technology/industrial-workspace/configure-indicator-by-threshold-weightage-order-otpsc.html |
| release | brazil |
| product | Industrial Workspace |
| classification | industrial-workspace |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Setting up the Operational Technology Progress ScorecardConfigureIndustrial WorkspaceOperational Technology |