Validate the completeness score calculation
Validate that the CMDB Health Dashboard - Completeness Score Calculation is activated to run if you want to include the OT Device Data Completeness (%) indicator in the Operational Technology (OT) Progress Scorecard.
Before you begin
Role required: admin
Procedure
-
Navigate to All > Industrial Workspace Admin > Guided Setup.
-
In the Industrial Workspace section, select OT Progress Scorecard.
-
In the Validate Completeness Score Calculation task, select Configure.
-
In the CMDB Health Dashboard - Completeness Score Calculation Scheduled Script Execution record, validate the following items:
- Validate that the Active check box is checked.
- To ensure accurate scores are collected for end of the month reporting, validate that Run field is configured
-
Select Update.
For more details on how completeness is calculated, see the Completeness section of CMDB Health KPIs and metrics.
Parent Topic:Setting up the Operational Technology Progress Scorecard
---
title: Validate the completeness score calculation
description: Validate that the CMDB Health Dashboard - Completeness Score Calculation is activated to run if you want to include the OT Device Data Completeness \(%\) indicator in the Operational Technology \(OT\) Progress Scorecard.
locale: en-US
canonical_url: https://www.servicenow.com/docs/r/operational-technology/industrial-workspace/validate-completeness-score-calculation-otpsc.html
release: brazil
product: Industrial Workspace
classification: industrial-workspace
topic_type: task
last_updated: "2026-09-10"
reading_time_minutes: 1
breadcrumb: [Setting up the Operational Technology Progress Scorecard, Configure, Industrial Workspace, Operational Technology]
---
# Validate the completeness score calculation
Validate that the **CMDB Health Dashboard - Completeness Score Calculation** is activated to run if you want to include the **OT Device Data Completeness \(%\)** indicator in the Operational Technology \(OT\) Progress Scorecard.
## Before you begin
Role required: admin
## Procedure
1. Navigate to **All** > **Industrial Workspace Admin** > **Guided Setup**.
2. In the **Industrial Workspace** section, select **OT Progress Scorecard**.
3. In the **Validate Completeness Score Calculation** task, select **Configure**.
4. In the **CMDB Health Dashboard - Completeness Score Calculation** Scheduled Script Execution record, validate the following items:
1. Validate that the **Active** check box is checked.
2. To ensure accurate scores are collected for end of the month reporting, validate that **Run** field is configured
5. Select **Update**.
For more details on how completeness is calculated, see the **Completeness** section of [CMDB Health KPIs and metrics](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/servicenow-platform/r_CMDBHealthMetrics.md).
**Parent Topic:**[Setting up the Operational Technology Progress Scorecard](https://raw.githubusercontent.com/ServiceNow/ServiceNowDocs/brazil/markdown/operational-technology/industrial-workspace/setting-up-the-ot-progress-scorecard.md)
| title | Validate the completeness score calculation |
| description | Validate that the CMDB Health Dashboard - Completeness Score Calculation is activated to run if you want to include the OT Device Data Completeness \(%\) indicator in the Operational Technology \(OT\) Progress Scorecard. |
| locale | en-US |
| canonical_url | https://www.servicenow.com/docs/r/operational-technology/industrial-workspace/validate-completeness-score-calculation-otpsc.html |
| release | brazil |
| product | Industrial Workspace |
| classification | industrial-workspace |
| topic_type | task |
| last_updated | 2026-09-10 |
| reading_time_minutes | 1 |
| breadcrumb | Setting up the Operational Technology Progress ScorecardConfigureIndustrial WorkspaceOperational Technology |